Client:
Contractor:
Country/city:
Explanation:
Scope of work:
Construction began:
Construction ended:
Duration:
Numb. of workers at peek:
Built area:
Zoning:
|
TCO - Tengizchevroil
Fintraco-Tepe JV
Kazakhstan _ Atyrau
9 floored office block with 7 typical floors
(2500 m2 each); additional 1 floor for presidency and
1 floor for administration (also 2500 m2 each), separate auditorium building (3000 m2), technical block
1.stage: Reinforced concrete workmanship of
auditorium and office buildings, all retaining and fence walls, 4900 m3 concrete
2.stage: All interior partition-gypsum walls (65000 m2);
Armstrong false ceelings (25000 m2); partial interior
finishing works
1.stage: March 2001 / 2.stage: September 2001
1.stage: September 2001 / 2.stage: November 2002
1.stage: 7 months / 2.stage: 15 months
1.stage: 45 workers / 2.stage: 190 workers
31000 m2 closed area
Offices, conference halls, auditorium, restaurants,
technical spaces
|